{"id":35217,"date":"2026-11-18T16:53:02","date_gmt":"2026-11-18T16:53:02","guid":{"rendered":"https:\/\/kashmirthunder.in\/?p=35217"},"modified":"2026-11-18T16:53:02","modified_gmt":"2026-11-18T16:53:02","slug":"sagar-calls-for-time-bound-upgradation-of-grid-stations","status":"publish","type":"post","link":"https:\/\/kashmirthunder.in\/index.php\/2026\/11\/18\/sagar-calls-for-time-bound-upgradation-of-grid-stations\/","title":{"rendered":"Sagar calls for time-bound upgradation of Grid Stations"},"content":{"rendered":"<p style=\"font-weight: 400;\"><strong><em>Reviews<\/em><\/strong><em> <strong>power infrastructure in Sopore, Baramulla<\/strong><\/em><\/p>\n<p style=\"font-weight: 400;\">BARAMULLA, NOVEMBER 18: Minister for Revenue, Power Development Department (PDD), Law Justice and Parliamentary affairs, Disaster Management, Relief, Rehabilitation and Reconstruction (DMRRR) and Election, Ali Mohammad Sagar, Wednesday undertook an extensive tour of Amargarh, Sopore and Delina to review the status of power infrastructure, ongoing upgradation works and electricity-related grievances being faced by the people of North Kashmir.<\/p>\n<p style=\"font-weight: 400;\">During the visit, the Minister, as per an official statement, inspected the Amargarh and Delina Grid Stations and reviewed the functioning of the existing transmission and distribution network, besides taking stock of various long-pending issues affecting reliable and uninterrupted power supply in Sopore, Baramulla, Rafiabad and adjoining areas.<\/p>\n<p style=\"font-weight: 400;\">The Minister was accompanied by MLA Irshad Rasool Kar, MLA Javaid Hassan\u00a0 Beigh, MLA Hazratbal Salman Ali Sagar and former\u00a0 President MC Sopore Masrat Kar, besides senior officers of the Power Development Department, KPDCL, public representatives and prominent citizens.<\/p>\n<p style=\"font-weight: 400;\">At Amargarh Grid Station, which has an installed capacity of 195 MVA (132\/33 KV) and caters to Sopore, Baramulla, Rafiabad, Watrigam, Watlab and SIDCO Industrial Estate, the Minister reviewed the existing capacity and stressed the need for its augmentation and modernisation in view of the growing electricity demand across the region. He observed that strengthening this important feeding station was essential for ensuring reliable power supply to domestic, commercial and industrial consumers.<\/p>\n<p style=\"font-weight: 400;\">At Delina Grid Station, having 480 MVA (220\/132 KV) and 100 MVA (132\/33 KV) installations, the Minister reviewed its strategic importance for the entire North Kashmir power network. He was informed that the station feeds six downstream grid stations at the 132 KV level, besides directly catering to Delina, Wagoora and Pattan at the 33 KV level.<\/p>\n<p style=\"font-weight: 400;\">Taking serious note of the delay in the proposed upgradation of the station, the Minister directed the concerned officers to expedite the approval and execution of the revised Detailed Project Report (DPR), which has reportedly been submitted but remained pending for the last two to three years. He stressed that unnecessary delays in vital infrastructure projects would not be tolerated and called for focused efforts to strengthen the power transmission network.<\/p>\n<p style=\"font-weight: 400;\">The Minister also took stock of the condition of the distribution infrastructure and public grievances relating to damaged and outdated electric poles, unsafe wiring and frequent power interruptions. He directed the concerned officers to undertake a comprehensive assessment of areas requiring replacement and relocation of poles, particularly in Khankhai Mohalla and other affected localities.<\/p>\n<p style=\"font-weight: 400;\">He observed that electric wires passing through trees and residential structures not only affect the reliability of power supply but also pose serious safety concerns. The Minister stressed that poles situated in paddy fields and those obstructing residential and agricultural activities should be relocated wherever technically feasible.<\/p>\n<p style=\"font-weight: 400;\">An important aspect of the visit was the assurance extended by the MLAs that they would contribute from their respective Constituency Development Funds wherever the department faces financial constraints, particularly for installation of new electric poles and other essential power infrastructure. The Minister appreciated this constructive initiative and said that coordinated efforts between elected representatives and the concerned departments would go a long way in addressing public grievances and improving electricity services.<\/p>\n<p style=\"font-weight: 400;\">The Minister also reviewed the prolonged delay in the construction and operationalisation of the Dalina workshop. Taking note of the pending issues despite the reported completion of the R&amp;B building and release of funds, he directed the concerned authorities to convene a coordination meeting with the R&amp;B Department and resolve all bottlenecks. He stressed that the workshop should be made fully functional with the required machinery, equipment and manpower.<\/p>\n<p style=\"font-weight: 400;\">The issue of inadequate availability of cranes, electrical panels and other maintenance equipment also came up for discussion. The Minister directed the department to ensure timely procurement and availability of essential machinery so that repair, cabling, shifting and restoration works are not unnecessarily delayed.<\/p>\n<p style=\"font-weight: 400;\">Expressing concern over the reported disparity in electricity consumption and payment of dues by certain government departments and establishments, the Minister called for strict monitoring of departmental power consumption and timely recovery of outstanding electricity bills. He observed that accountability in the payment of electricity dues was equally important and that ordinary consumers should not be made to bear the consequences of institutional inefficiencies.<\/p>\n<p style=\"font-weight: 400;\">The Minister further stressed the need for equitable power distribution in Tarzoo, Panzipora and adjoining areas, directing the officers to rationalise the distribution network and examine alternative feeding arrangements, including the Soura source, wherever technically feasible. He called for improved load management and minimum possible curtailment, particularly during peak demand.<\/p>\n<p style=\"font-weight: 400;\">Sagar also emphasised better interdepartmental coordination, directing the concerned authorities to convene a joint meeting of Irrigation and PHE departments to resolve pending bills and related issues. Coordination with R&amp;B was also stressed for expediting pending works and ensuring proper utilisation and booking of released funds. The issues concerning Zainageer Block were also flagged for focused attention.<\/p>\n<p style=\"font-weight: 400;\">During the interaction, the Managing Director, KPDCL, assured the Minister that issues relating to replacement and shifting of electric poles, distribution deficiencies and rationalisation of power supply in Tarzoo, Panzipora and adjoining areas would be addressed on priority. He also assured that necessary coordination would be maintained to minimise power interruptions and improve the overall supply position.<\/p>\n<p style=\"font-weight: 400;\">The Minister directed the concerned officers to prepare a time-bound action plan for strengthening the transmission and distribution network, replacing obsolete infrastructure, expediting stalled projects and enhancing the capacity of existing grid stations.<\/p>\n<p style=\"font-weight: 400;\">Emphasising the need for a long-term and result-oriented approach, Sagar said that the growing electricity requirements of North Kashmir could not be addressed through temporary arrangements and routine interventions alone. He stressed that the department must move beyond conventional explanations of resource constraints and ensure effective planning, coordination and timely execution of infrastructure projects.<\/p>\n<p style=\"font-weight: 400;\">The Minister said that reliable electricity supply was an essential public service and that the government was committed to addressing the genuine concerns of the people through sustained infrastructure development and improved service delivery.<\/p>\n<p style=\"font-weight: 400;\">He directed the officers to accord top priority to public grievances, ensure accountability at every level and work in close coordination with elected representatives so that the people of Sopore, Baramulla and the entire North Kashmir region receive better, safer and more reliable electricity services.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Reviews power infrastructure in Sopore, Baramulla BARAMULLA, NOVEMBER 18: Minister for Revenue, Power Development Department (PDD), Law Justice and Parliamentary affairs, Disaster Management, Relief, Rehabilitation and Reconstruction (DMRRR) and Election, Ali Mohammad Sagar, Wednesday undertook an extensive tour of Amargarh, Sopore and Delina to review the status of power infrastructure, ongoing upgradation works and electricity-related [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":35218,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"jnews-multi-image_gallery":[],"jnews_single_post":[],"jnews_primary_category":[],"jnews_social_meta":[],"jnews_override_counter":[],"footnotes":""},"categories":[3],"tags":[],"class_list":["post-35217","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-local"],"_links":{"self":[{"href":"https:\/\/kashmirthunder.in\/index.php\/wp-json\/wp\/v2\/posts\/35217","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/kashmirthunder.in\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/kashmirthunder.in\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/kashmirthunder.in\/index.php\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/kashmirthunder.in\/index.php\/wp-json\/wp\/v2\/comments?post=35217"}],"version-history":[{"count":1,"href":"https:\/\/kashmirthunder.in\/index.php\/wp-json\/wp\/v2\/posts\/35217\/revisions"}],"predecessor-version":[{"id":35219,"href":"https:\/\/kashmirthunder.in\/index.php\/wp-json\/wp\/v2\/posts\/35217\/revisions\/35219"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/kashmirthunder.in\/index.php\/wp-json\/wp\/v2\/media\/35218"}],"wp:attachment":[{"href":"https:\/\/kashmirthunder.in\/index.php\/wp-json\/wp\/v2\/media?parent=35217"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/kashmirthunder.in\/index.php\/wp-json\/wp\/v2\/categories?post=35217"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/kashmirthunder.in\/index.php\/wp-json\/wp\/v2\/tags?post=35217"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}