• About
  • Shop
  • Forum
  • Contact
No Result
View All Result
e-Paper
Kashmir Thunder - Latest News, Breaking News
Friday, November 13, 2026
  • HOME
  • News
    • Top Headlines
    • Local
    • National
    • World
  • Business
  • Science & Tech
  • Education
  • Health
  • Opinion
    • Editorial
    • Feature
    • Review
  • Sports
    • Cricket
    • Football
    • Others
  • EPAPER
  • HOME
  • News
    • Top Headlines
    • Local
    • National
    • World
  • Business
  • Science & Tech
  • Education
  • Health
  • Opinion
    • Editorial
    • Feature
    • Review
  • Sports
    • Cricket
    • Football
    • Others
  • EPAPER
No Result
View All Result
Kashmir Thunder - Latest News, Breaking News
No Result
View All Result
  • HOME
  • News
  • Business
  • Science & Tech
  • Education
  • Health
  • Opinion
  • Sports
  • EPAPER

CS for accountability, speed to achieve power sector reforms

by KT News Desk
November 25, 2025
Reading Time: 3 mins read
CS for accountability, speed to achieve power sector reforms
Share on FacebookShare on TwitterWhatsapp

Reviews pace, progress of loss reduction, smart metering works

JAMMU, NOVEMBER 25: Chief Secretary, Atal Dulloo Tuesday undertook an in-depth review of the reforms being implemented by the Power Development Department (PDD) across Jammu and Kashmir with a focus on enhancing operational efficiency, strengthening infrastructure and substantially reducing power losses under the Revamped Distribution Sector Scheme (RDSS).

The review meeting was attended by Additional Chief Secretary, PDD; Managing Director, JPDCL/KPDCL; Chief Engineers of the Corporations; representatives of NTPC and PESL, besides other senior officers.

Emphasising the need for strict adherence to timelines, the Chief Secretary directed that all ongoing reform works aimed at loss reduction must be completed within the sunset period prescribed under RDSS by the Government of India.

He stressed on fixing daily and weekly targets for all components of loss reduction works, including LT cable replacement, augmentation and replacement of the distribution system, HT line cabling, replacement of HT conductors, feeder segregation and installation of electric poles.

He further underlined the importance of improving feeder-wise billing and revenue collection efficiency and called for stringent action against officials found negligent or lax in discharging their responsibilities. The Chief Secretary instructed the Divisional Commissioners of Jammu and Kashmir to conduct monthly reviews and identify field-level staff failing to perform responsibly.

To prevent delays during the harsh winter season, especially in snow-bound and remote areas, the Chief Secretary underscored the need for advance dumping of essential material in difficult terrains to ensure uninterrupted execution of works despite road closures.

 He also directed senior officers and Deputy Commissioners to maintain continuous oversight for timely resolution of bottlenecks and to keep the pace of implementation up to the mark.

The ACS PDD, Shailendra Kumar urged all Project Implementing Agencies (PIAs) to submit comprehensive action plans for accelerating progress on the ground. He encouraged parallel execution of multiple components immediately after the erection of electric poles and sought detailed information on transportation and delivery of materials to remote areas like Marwah, Wadwan, Gurez and Tanghdar.

He also emphasised the need for immediate regularisation of illegal connections to augment government revenue and provide uninterrupted supply to consumers.

Sensitising PESL and NTPC, he called upon them to significantly accelerate their execution pace, assuring them of proportionate funding support once received by the Department from the Ministry of Power. He urged the agencies to clearly define milestones and adhere strictly to committed timelines.

MD JPDCL, Gurpal Singh, in his detailed presentation, outlined the progress of loss reduction, modernisation and smart metering initiatives under Phase-I of RDSS. He informed that works worth ₹4,709 Cr under loss reduction and ₹1,053 Cr under smart metering are targeted for completion in this phase across J&K.

He explained that works have been divided into multiple packages and awarded to four PIAs including JPDCL, KPDCL, PESL and NTPC for their completion within stipulated deadlines.

The PIA-wise progress in Loss Reduction and IT/OT works stood at 74% for JPDCL, 73% for KPDCL, 57% and 33% for PESL in Kashmir and Jammu respectively, and 72% and 31% for NTPC in these divisions.

The meeting was further informed that AT&C losses have already been reduced from 58% in 2022 to around 32% at present, with a target to bring them down to 12% by 2028. Similarly, the ACS-ARR gap has been reduced from ₹3.11 to ₹1.29, while billing efficiency has improved from 56% to 69% and collection efficiency from 75% to 94%, reflecting significant strides towards financial sustainability and operational efficiency in the power sector.

Regarding smart metering, it was disclosed that out of 7,62,872 meters to be installed by JPDCL, 1,87,894 have been installed so far, while KPDCL has installed 1,93,777 meters out of the targeted 7,27,855, marking steady progress towards a transparent and consumer-friendly power distribution mechanism across the districts of J&K.

Previous Post

DC Budgam chairs meeting on SC rulings over stray dog menace

Next Post

SMC issues advisory on animal welfare

KT News Desk

KT News Desk

READ MORE

Sagar stresses strengthening of revenue services

by KT News Desk
November 13, 2026
Sagar stresses strengthening of revenue services

Assures resolution of public grievances JAMMU, NOVEMBER 12: Minister for Revenue, Relief, Power Development Department (PDD), Disaster Management, Relief, Rehabilitation and Reconstruction (DMRRR), and Elections, Ali Mohammad Sagar, Thursday held an extensive...

Read moreDetails

PM Surya Ghar Muft Bijli Yojana : DC Srinagar reviews progress of Rooftop Solar installations

by KT News Desk
November 13, 2026
PM Surya Ghar Muft Bijli Yojana :  DC Srinagar reviews progress of Rooftop Solar installations

SRINAGAR NOVEMBER 12: In order to assess the progress of Rooftop Solar installations under PM Surya Ghar Muft Bijli Yojana a meeting was held under the chairmanship of the Deputy Commissioner (DC)...

Read moreDetails

DC Srinagar reviews plan & design of approved District Mini Secretariat at Batamaloo

by KT News Desk
November 13, 2026
DC Srinagar reviews plan & design of approved District Mini Secretariat at Batamaloo

SRINAGAR, NOVEMBER 12: Deputy Commissioner (DC) Srinagar, Akshay Labroo, on Thursday chaired a comprehensive meeting at the Conference Hall of the DC Office Complex to review the plan and design of construction...

Read moreDetails

ADDC Kupwara inspects SDH Sogam; reviews healthcare facilities, winter preparedness

by KT News Desk
November 13, 2026
ADDC Kupwara inspects SDH Sogam; reviews healthcare facilities, winter preparedness

KUPWARA, NOVEMBER 12: Additional District Development Commissioner (ADDC) Kupwara, Ghulam Rasool Thursday inspected Sub-District Hospital (SDH) Sogam and held a detailed on-spot review of healthcare facilities with special focus on winter preparedness....

Read moreDetails

Door-to-door waste collection introduced in rural areas of Udhampur

by KT News Desk
November 13, 2026
Door-to-door waste collection introduced in rural areas of Udhampur

UDHAMPUR, NOVEMBER 12: District Administration Udhampur Thursday launched a door-to-door solid waste collection initiative in rural areas of the district. Deputy Commissioner Ananth Dwivedi flagged off the waste collection vehicle from the...

Read moreDetails

Work on Rs. 4.42 Crore Dev Sathan River Front project takes off at Bhandarkoot- Kishtwar

by KT News Desk
November 13, 2026
Work on Rs. 4.42 Crore Dev Sathan River Front project takes off at Bhandarkoot- Kishtwar

KISHTWAR, NOVEMBER 12: The Leader of Opposition J&K Legislative Assembly Sunil Kumar Sharma (MLA Paddar-Nagseni) Thursday laid the foundation stone for the development of Dev Sathan RiverFront here at Bhandarkoot. Deputy Commissioner...

Read moreDetails

DC reviews traffic management in Udhampur Township

by KT News Desk
November 13, 2026
DC reviews traffic management in Udhampur Township

UDHAMPUR, NOVEMBER 12: Deputy Commissioner Ananth Dwivedi Thursday convened a meeting with officers of the concerned departments to review traffic management in Udhampur town and discuss measures aimed at ensuring smooth traffic...

Read moreDetails

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

© 2025 Kashmir Thunder - Designed by K.Web.

No Result
View All Result
  • HOME
  • News
    • Top Headlines
    • Local
    • National
    • World
  • Business
  • Science & Tech
  • Education
  • Health
  • Opinion
    • Editorial
    • Feature
    • Review
  • Sports
    • Cricket
    • Football
    • Others
  • EPAPER

© 2025 Kashmir Thunder - Designed by K.Web.